Project Closeout

As-Built Survey.

The design shows what was intended; the as-built shows what happened. An as-built survey measures the completed improvements — structures, utilities, grades and site features — and documents them against the design, producing the record your closeout, your client and the next project will depend on.

Who typically needs this

  • General contractors closing out a project
  • Owners who want a reliable record of their completed asset
  • Agencies requiring as-built documentation for acceptance
  • Engineers certifying completed grading or improvements

Common situations

  • Project closeout requires documented as-built conditions
  • A grading certificate needs surveyed final elevations
  • Newly installed utilities must be recorded before burial or paving
  • A future phase needs to know precisely what phase one built

What KEG does

  1. 01Survey the completed improvements the scope requires
  2. 02Compare as-built positions and elevations against the design
  3. 03Draft record drawings in your project's CAD standards
  4. 04Certify the documentation where the agency requires it

What you receive

  • As-built record drawings (CAD and PDF)
  • Comparison against design where specified
  • Certifications the accepting agency requires

Most jobs are completed in 1–2 weeks. Scope, schedule and price are confirmed with you before fieldwork begins.

What affects cost

  • Scope of improvements to document
  • Whether work must be surveyed in phases before burial
  • Agency documentation standards

What affects timing

  • Construction completion schedule
  • Phased visits for utilities before they are covered

As-Built Survey questions

When should as-built survey work be scheduled?

Ideally in phases, while underground work is still visible. Documenting utilities before burial is far more accurate and less expensive than locating them afterward.